Expand >>




Project Status: Bid Mgmt

Set Price: $357.90
Sheet Price: $1.10
CLT Airport West Ramp Expansion Phase II
The West Ramp will be expanded to its ultimate configuration. This expansion will allow for new concrete pavement for aircraft loading. Drainage structures located within this pavement will be built to accommodate loads from aircraft and convey water from added pavement area. A jet fuel hydrant system will be built to provide fueling to the gate positions at the future concourse. This system will include extending a jet fuel system from an existing control valve vault. Additionally, Rental Car Rd. from the exiting round]about on Old Dowd to the south will be reconstructed with new geometrics and grades to accommodate a new prescreening area, gate 80, and associated buildings and
canopies (guardhouse and prescreening).
A GSE facility will be constructed immediately to the north of the West Ramp Expansion. The GSE facility will include approximately 15,000 square yards of concrete pavement for vehicles, a fuel station for ground vehicles, a glycol storage tank and dispenser, and lavatory dump shelter with a wastewater grinder. This system will tie to existing sanitary sewer on Rental Car Road.

Select a folder to order smaller sets or downloads

Listed Company: Talbert, Bright and Ellington
Pre Bid Date: Thursday, January 16, 2020 1:00 PM
Bid Due Date: Thursday, January 30, 2020 2:00 PM
Location: Charlotte Douglas Interional Airport  View a Map of this Location
City: Charlotte
State: North Carolina
Plans: Available
Specifications: Available
Job Purchase Information: Non refundable
Addendum Purchase Information: Non refundable
Job/Project #: AVIA 20-19
Bid Location: CLT Center: 5601 Wilkinson Blvd., Charlotte, NC
Pre Bid Location: CLT Center: 5601 Wilkinson Blvd., Charlotte, NC
Email Address: ashook@tbeclt.com