Expand >>




Project Status: Bid Mgmt

Set Price: $67.30
Sheet Price: $1.95
Faulconbridge Road 5749 Storm Drainage Improvement Project
Faulconbridge Rd 5749 will include the lining 556 LF of 42 inch CMP and 227 LF of 15 inch RCP with CIPP. Eight existing drainage structures will be removed and replaced and two additional structures will be added. 125 LF of 15" RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approximately 20 locations throughout the 42" CMP. The estimated cost of the project is $941,629.20.

Select a folder to order smaller sets or downloads

Listed Company: Charlotte Water
Pre Bid Date: Thursday, May 14, 2026 10:00 AM
Bid Due Date: Thursday, May 28, 2026 10:00 AM
Location: City Limits  View a Map of this Location
City: Charlotte
State: North Carolina
Plans: Available
Specifications: Available
Job Purchase Information: Non-refundable
Addendum Purchase Information: Non-refundable
Bid Location: Charlotte Water Second Floor Small Conference Room 202: 5100 Brookshire Blvd.; Charlotte, NC
Pre Bid Location: Microsoft TEAMS
Email Address: Katherine.Osborne@charlottenc.gov