The 6317 Birmingham Drive SDIP will include the installation of 1,281 linear feet of RCP, ranging in size from 15-inch to 42-inch. The installation depth of the RCP system will range from 5 feet to 14 feet and will require foundation protection approved by a professional engineer. There will also be 17 linear feet of 3-foot by 3-foot cast-in-place box culvert and 38 linear feet of 4-foot by 2-foot cast-in-place box culvert installation crossing Birmingham Drive. The estimated cost of the project is $2,444,658.