Expand >>




Project Status: Bid Mgmt

Set Price: $60.70
Sheet Price: $1.95
Collective Storm Drainage Improvement Project Series - AF
Collective Storm Drainage Improvement Projects Series AF will involve 2 projects throughout the City of Charlotte, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9x7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15" RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9x7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs

Select a folder to order smaller sets or downloads

Listed Company: Charlotte Water
Pre Bid Date: Thursday, September 25, 2025 2:00 PM
Bid Due Date: Thursday, October 9, 2025 2:00 PM
Location: City Limits  View a Map of this Location
City: Charlotte
State: North Carolina
Plans: Available
Specifications: Available
Job Purchase Information: Non-refundable
Addendum Purchase Information: Non-refundable
Job/Project #: TK23150507
Bid Location: Charlotte Water First Floor Conference Room: 5100 Brookshire Blvd.; Charlotte, NC
Pre Bid Location: Microsoft TEAMS
Email Address: Katherine.Osborne@charlottenc.gov