McDowell Creek WRRF Primary Clarifier No. 5 Rehabilitation
The Project consists of demolition and disposal of existing Primary Clarifier No. 5 mechanism and ancillary components; installation of new circular clarifier mechanism purchased via a separate Procurement Contract; replacement of all exposed piping and valves inside the sludge and scum vaults; replacement of concrete topper inside Primary Clarifier No. 5; repairs of structural elements within the basin; modification of existing chemical feed dosing locations in the effluent flow vault; replacement of seals, actuators, and stems on existing slide and sluice gates.
Listed Company:
Charlotte Water
Pre Bid Date:
Tuesday, March 4, 2025 10:00 AM
Bid Due Date:
Friday, May 2, 2025 10:00 AM
Location:
4901 Neck Road
City:
Huntersville
State:
North Carolina
Plans:
Available (Hard Copies Only)
Specifications:
Available (Hard Copies Only)
Job Purchase Information:
Non-refundable
Addendum Purchase Information:
Non-refundable
Bid Location:
Charlotte Water Second Floor Conference Room:5100 Brookshire Blvd.; Charlotte, NC
Pre Bid Location:
McDowell Creek WWRF Large Conference Room: 4901 Neck Rd.; Huntersville, NC